All study guides
Lead Service LinesIntermediate 35 min read

Great Lakes Lead Service Line Field Rules: Michigan's Full-Replacement Mandate, Illinois' Partial-Replacement Ban, Ohio's Two-Day Notices and Sampling After Disturbance

How lead service line rules in Michigan, Illinois and Ohio go beyond the federal floor: what counts as a lead line, replacement rates, the partial-replacement ban, emergency-repair checklists, notice clocks and first/fifth-liter sampling, with worked examples for Great Lakes distribution crews.

EPA's 2025 state projections put about 2.11 million of the nation's roughly 3.96 million lead and galvanized-requiring-replacement service lines in just eight states: Ohio, Michigan, Indiana, Illinois, Wisconsin, Minnesota, Iowa and Missouri. That is more than half, with Illinois first in the nation and Ohio second. Several of these states moved before the federal Lead and Copper Rule Improvements. Michigan's 2018 rule requires full replacement of every lead line, and its lead action level dropped to 12 µg/L on January 1, 2025. Illinois bans partial replacement and writes replacement rates into statute. Ohio gives a system two business days to tell a household that its tap tested high. When a crew in this zone exposes a curb stop, state rules decide what it may cut, who must be told and by when, which filter goes on the kitchen tap, and which liter goes into the sample bottle. This guide

Read the full guide

Create a free account to unlock the complete guide — every concept explained in depth, worked examples, and cited sources — plus practice exams and an AI tutor scoped to your license.

Free to start · no card required