Plant Capacity Studies, Equipment Selection and Facility Upgrades

How to compute percent of design capacity, project growth to planning triggers (with Colorado's 80/95 percent rule), and compare equipment by efficiency and life-cycle cost.

Nobody wants to learn that a treatment plant is full when the permit is already being violated. Class 3 operators are expected to help see it coming: to express flow and loading as a percent of design capacity, project when the plant will reach trigger points, help choose pumps, blowers and other equipment on capacity, efficiency and life-cycle cost, and take part in studies for capacity increases, new treatment requirements and facility upgrades. This guide gives you the math and the judgment to do that, plus the Colorado permit triggers as a worked regulatory example.
Why the operator is at the table
The WPI/ABC Need-to-Know criteria for Class 3 wastewater treatment list these job tasks: assist in selecting equipment for wastewater processing, and participate in studies related to increasing capacity, changes in treatment requirements, or facility upgrades. Engineers design and th

Read the full guide

Create a free account to unlock the complete guide — every concept explained in depth, worked examples, and cited sources — plus practice exams and an AI tutor scoped to your license.

Free to start · no card required